This project involves the Design and Construction of the Bridge for the 75 MW Solar Power Plant at Sonagazi, Feni, Bangladesh.
The bridge is constructed to provide safe and reliable access for operational, maintenance, and logistical activities within the solar power plant. The design ensures structural stability, durability, and integration with the solar plant’s layout while accommodating transportation of personnel, equipment, and materials.
This infrastructure supports efficient plant operation, facilitates routine maintenance, and enhances the overall functionality of the 75 MW solar installation.