This project involves the Design, Supply, Installation, Testing, and Commissioning of a 230 kV Distribution Line at Sonagazi, Bangladesh.
The scope of work includes erecting transmission towers, stringing conductors, installing insulators, protective devices, and grounding systems to ensure reliable high-voltage power distribution. The project is designed to enhance grid stability, improve electricity delivery, and reduce transmission losses in the region.
This distribution line supports the national power network, ensuring efficient and uninterrupted electricity supply to industrial, commercial, and residential consumers.